Skip to main content
Services Shadow Diagrams Daylight & Sunlight 3D Visualisation Point Cloud to BIM Portfolio About Contact Showreel
Get a Quote
Manchester · Greater Manchester · 10 Boroughs

Daylight & Sunlight Assessments
for Manchester Planning.

daylight and sunlight assessments — VSC, APSH and NSL analysis — for planning applications across Manchester and Greater Manchester, from suburban extensions to high-rise schemes near Deansgate Square and Beetham Tower. Joining our service line in late August 2026 — enquire now to reserve an early slot.

18+ Years Experience Current UK Planning Standards VSC / APSH / NSL 48-Hour First Draft

We confirm the applicable BRE 209 criteria with your council before modelling begins

VSC — Vertical Sky Component
27% threshold · less than 20% reduction of former value · skylight adequacy · BRE 209 §2.2
APSH — Annual Probable Sunlight Hours
25% annual sunlight hours · 5% winter minimum · main living rooms within 90° of south · BRE 209 §3.2
NSL — No Sky Line
0.8× former value threshold · working plane analysis · direct skylight proportion · BRE 209 §2.3
Shadow Diagrams — Included
Overshadowing at equinox and winter solstice · matched to your council's brief
What We Deliver

A daylight assessment is not the same as a shadow diagram.

Knowing where a shadow falls and knowing whether a window still gets enough light are two different questions. The second one — governed by BRE 209 — is what Manchester City Council actually weighs when judging neighbour amenity, particularly on the denser city centre schemes. If your project only needs the shadow picture, not the full calculation, go for Shadow Diagrams Manchester instead — from £280.

27%
VSC threshold — adequate skylight under BRE 209 §2.2
25%
APSH minimum — annual probable sunlight hours
0.8×
NSL threshold — no sky line reduction limit
Not to be confused with Right to Light

The two get confused constantly, but they're not the same thing. BRE 209 is judged by the council during planning. Right to Light is a private matter between neighbours that builds up over time and has nothing to do with planning permission — the council doesn't rule on it either way. We handle the BRE 209 side; for Right to Light, you'd need a solicitor or a specialist surveyor.

What You Receive

What a BR 209 Daylight and Sunlight Assessment Can Include

One fixed price for your Manchester submission. VSC, APSH and NSL calculated for every affected window, plus shadow diagrams, methodology statement and one free amendment — see the full deliverable breakdown on our UK page.

  • ✓ VSC for all affected windows
  • ✓ APSH for main living room windows
  • ✓ NSL working plane analysis
  • ✓ Shadow diagrams included
  • ✓ Methodology statement (DAS-ready)
  • ✓ One free planning amendment
BRE 209 Reference

27% VSC · 25%/5% APSH · 0.8× NSL

Manchester City Council applies BRE 209 (2022) with contextual flexibility in city centre regeneration zones like NOMA and Ancoats — we confirm the applicable approach before commencing. For the full explanation of each metric, see our UK-wide BRE 209 reference.

Where Manchester assessments fall down.

Three recurring mistakes cause most of the pushback we see from Manchester City Council.

Where It Goes Wrong
  • A window doesn't make the cut

    In mixed-use city centre schemes, it's easy to overlook a secondary bedroom or a ground-floor unit facing the development — miss one and expect the whole report back for rework.

  • Data with no conclusion attached

    A spreadsheet of VSC figures isn't a decision. Council officers want to see, in writing, whether each window passes or fails against BRE 209 — not have to work it out themselves.

  • Density estimated, not measured

    Around NOMA, Ancoats and other regeneration zones, building heights change fast. An assessment based on out-of-date massing rarely holds up.

Our Standard
  • Nothing left off the list

    We map out every window in scope before modelling starts and agree it with you in writing — ground floor units included.

  • A clear pass or fail, every time

    Each VSC, APSH and NSL figure states its BRE 209 outcome directly, worded for a planning officer to read and act on.

  • Current geometry, verified

    We model from up-to-date survey or OS data, and flag regeneration-zone schemes early so the density case is ready for the council from day one.

How It Works

From brief to planning-ready BRE 209 assessment in four steps

01

Send Your Brief

Get your drawings, an OS extract and your council name over to us. From that alone, we can tell you exactly what BRE 209 will require for your site before we start.

02

Scope Confirmed in Writing

We write back with the full list of windows in scope, which BRE 209 metrics apply, and anything Manchester City Council specifically asks for — all before the model gets built.

03

First Draft in 48 Hours

Model gets built and checked against OS survey data, then VSC, APSH and NSL are run for every window on the list. You'll have a first draft, methodology statement included, inside 48 hours.

04

Final Report & Source Files

Review it, send us one round of changes, and we'll turn around the final PDF, result tables and DWG files — ready to attach to your Planning Portal submission.

Fixed-Price Quotes

Transparent pricing. No surprises.

Every quote is fixed price — not hourly. Invoiced in GBP. No VAT applicable.

Standard BRE 209 Assessment
£450

Up to 10 windows assessed. VSC + APSH + NSL. Single planning application.

  • VSC for all affected windows
  • APSH for main living room windows
  • NSL working plane analysis
  • Shadow diagrams at equinox & solstice
  • BRE 209 methodology statement
  • Window-by-window interpretation against the applicable criteria
  • 1 free planning amendment · NET 14

All prices in GBP. No VAT — invoiced from KAS STUDIO DOOEL, Skopje, North Macedonia. Fixed quotes within 24 hours of brief received.

Enquire About August Slots
Coverage

Manchester City and all ten Greater Manchester boroughs

Not listed here? Get in touch — we work with every Manchester borough.

Manchester City Centre
Salford
Trafford
Stockport
Bolton
Bury
Oldham
Rochdale
Tameside
Wigan
MediaCityUK
NOMA / Ancoats
FAQ

Common questions about BRE 209 daylight assessments in Manchester

A full BRE 209 assessment is typically required for larger applications — multi-storey development, residential schemes close to existing dwellings, or wherever a council's validation checklist specifies one. Manchester City Council frequently requires full VSC/APSH/NSL analysis for city centre regeneration schemes assessments for applications above a certain height or density. We check your specific council's requirements before starting.
No. A BRE 209 daylight and sunlight assessment is a planning matter, assessed by your council as part of the application. Right to Light is a separate civil law matter between neighbouring landowners and isn't decided by the planning authority. A scheme can fully satisfy BRE 209 and still face a separate Right to Light claim. We prepare planning-stage BRE 209 reports; Right to Light matters should go to a solicitor or Right to Light surveyor.
Manchester City Council plus all Greater Manchester metropolitan boroughs — Salford, Trafford, Stockport, Bolton, Bury, Oldham, Rochdale, Tameside and Wigan. We regularly prepare BRE 209 assessments for city centre regeneration schemes (NOMA, Ancoats, Spinningfields, Green Quarter), MediaCityUK in Salford, and suburban applications across all ten boroughs.

More questions on files, VAT, VSC/APSH/NSL definitions and turnaround? See the full FAQ on our UK page.

Get a Quote

Fixed-price quote within 24 hours.

  • BRE 209 assessments from late August 2026
  • Enquire now to reserve an early slot
  • 48-hour first draft
  • 1 free planning amendment included
  • No VAT · NET 14 payment terms
Assessed against BR 209 (2022) where required · VSC / APSH / NSL 18+ years of planning documentation

Prefer to email directly? info@casstudio.com