Skip to main content
Services Shadow Diagrams Daylight & Sunlight 3D Visualisation Point Cloud to BIM Portfolio About Contact Showreel
Get a Quote
Queensland · Shadow Diagram Service

Shadow Diagrams for
Brisbane DA Submissions.

Planning-focused shadow diagrams and overshadowing studies for Brisbane development applications. Send your project address, drawings and any planning request — we confirm the required shadow scope before quoting.

Est. 2008 Brisbane Planning Scope Reviewed Fixed Prices From AUD 400 48-Hour First Draft

We read your council's planning scheme before we model a single shadow

Brisbane City Plan 2014
Overshadowing controls for residential zones · solar access to adjoining properties · reference dates confirmed per planning scheme
State Planning Policy (SPP)
QLD state planning requirements for solar access · habitable rooms and private open space · council-specific reference dates
Local Planning Scheme Controls
Brisbane City Council zone-specific controls · neighbourhood plan requirements · confirmed before work starts
Neighbouring Councils
Moreton Bay Regional Council · Ipswich City Council · Logan City Council · Redland City Council · Scenic Rim
What You Receive

Complete shadow documentation for your Brisbane development application

One fixed price. No hidden extras. No surprise charges for additional time-points or revision rounds.

Shadow Footprints at All Required Times

Existing and proposed shadows distinguished by colour at every council-required time-point — at the reference date and times set by the applicable planning scheme, with additional times where your scheme requires them.

Project-Specific Overshadowing Review

Where the project brief identifies an overshadowing or solar access assessment criterion, the study is prepared and summarised against that confirmed requirement.

Full Methodology Statement

Written methodology confirming software and sun-path model, site coordinates, applicable planning scheme provision and reference standard, analysis dates and times, and true north basis. Ready to include in your DA documentation as-is.

True North & Survey-Accurate Geometry

True north confirmed against your registered survey plan. Site boundaries, neighbouring property footprints and street alignment verified before work starts. Scale bar and north point annotation consistent with your architectural drawings.

Print-Ready PDF + DWG / ArchiCAD Source

A4/A3 print-ready PDF formatted for DA lodgement, plus full DWG and ArchiCAD source files. No locked files, no watermarks. Your architect can incorporate the drawings directly into the DA documentation set.

1 Included Revision

One revision round is included within the agreed project scope. We review the request, update the analysis and re-issue the set within 48 hours.

Sample Work

What our shadow diagrams look like

Extracts from a Brisbane City Council development application prepared by CasStudio in 2026. Address, lot number and client details have been removed.

Hourly shadow plans for 21 June from 9am to 3pm AEST showing the shadow cast by a proposed dwelling on the neighbouring house, Brisbane City Council development application
Hourly shadow plans, 21 June9am to 3pm AEST, winter solstice. Shadow from the proposed dwelling assessed at wall and roof-plane level of the neighbouring dwelling.
Isometric 3D views of the shadow cast by a proposed dwelling at 1pm, 2pm and 3pm on 21 June, Brisbane development application
3D shadow views, 21 JuneIsometric views at 1pm, 2pm and 3pm AEST showing the shadow cast by the proposed dwelling only.
Standards Reference

Applicable Planning Scheme Review

We review the property-specific City Plan information, including relevant zones, overlays, neighbourhood plans and development codes, together with any planning request or assessment benchmark supplied for the project.

Brisbane City Plan 2014 + SPP
Overshadowing and Solar Access in Brisbane

Brisbane shadow diagram requirements are set by the Brisbane City Plan 2014 in combination with the Queensland State Planning Policy (SPP). Unlike NSW (which uses the ADG) or VIC (which uses ResCode), Brisbane's controls are zone-specific and must be confirmed against the applicable neighbourhood plan and the development code for the relevant zone.

Key parameters we confirm before starting every Brisbane project include: the applicable reference date (Brisbane does not have a single universal reference date — it varies by zone and development type), the required time-points, and the specific overshadowing threshold for the applicable zone. For multi-storey residential in higher-density zones, the City Plan Low Medium Density Residential Zone Code or the High Density Residential Zone Code applies.

We read your council's planning scheme and confirm all parameters in writing before modelling begins.

Brisbane City Plan 2014 / SPP
Council Coverage

Brisbane councils we cover

We prepare shadow diagrams for Brisbane City Council and councils across South East Queensland. Each council and zone has specific planning scheme requirements — we confirm them before starting.

Brisbane City CouncilMoreton Bay Regional CouncilGold Coast City CouncilIpswich City CouncilLogan City CouncilRedland City CouncilSunshine Coast CouncilScenic Rim Regional CouncilSomerset Regional Council
How It Works

From brief to council-ready shadow diagram in four steps

01

Send Your Brief

Share your DA drawings, survey, and council name or DA reference number. We confirm the applicable planning scheme provision, reference dates and any specific requirements before starting.

02

Planning Scheme Research & Scope

We read your council's planning scheme and confirm the applicable Brisbane City Plan / SPP requirements, reference dates and analysis parameters in writing before work starts. No surprises mid-project.

03

First Draft in 48 Hours

Survey-accurate 3D model built. Shadow footprints generated at all required times. Methodology statement prepared. First working draft delivered within 48 hours of confirmed project start.

04

Final Deliverables

After your review and one revision round, final print-ready PDF, DWG and ArchiCAD source files delivered. Ready to lodge with your Brisbane council DA.

Fixed-Price Quotes

Transparent pricing. No surprises.

Every quote is fixed price — not hourly. Invoiced in AUD, no GST applicable.

Single Lot DA
AUD 400

Standard residential DA — single site, up to 3 required time-points, one planning scheme reference.

  • Shadow footprints at all council-required assessment times
  • Existing vs proposed shadows
  • Overshadowing requirement verification
  • True north calibration + scale bar
  • Methodology statement included
  • Print-ready PDF + DWG/ArchiCAD source
  • 1 included revision · NET 14
Extended Shadow Study
AUD 750

Townhouses, multi-dwelling, or council-specific extra requirements.

  • Everything in Single Lot DA, plus:
  • Hourly intervals where required by council
  • Elevation shadow diagrams on neighbouring walls
  • Additional reference dates where required
  • 3D perspective shadow views

All prices in AUD, excluding GST. Invoiced from KAS STUDIO DOOEL, Skopje, North Macedonia. Fixed quotes issued within 24 hours of brief received.

Get a Fixed-Price Quote
FAQ

Brisbane shadow diagram questions

Shadow diagrams for Brisbane DA submissions are assessed under the Brisbane City Plan 2014 and the State Planning Policy (SPP). Brisbane City Council has its own specific planning scheme provisions for overshadowing and solar access that apply to residential development. We review the applicable Brisbane City Plan provisions, state requirements and any project-specific information request before confirming the scope.
Unlike NSW or Victoria, Queensland has no single statewide reference date — the dates and times are set by the applicable planning scheme provisions for your site. We confirm them against Brisbane City Plan or your local scheme before starting every project.
Brisbane City Council information requests commonly ask for shadow plans at hourly intervals between 9am and 3pm on 21 June (the winter solstice), rather than the three fixed times used in NSW. That was the scope on our Brisbane City Council DA at Seven Hills (2026): hourly 21 June shadow plans with the proposed and existing shadows shown separately. We confirm the exact times against your council's request before starting.
We need your DA drawings (DWG, PDF or ArchiCAD preferred), a registered survey for true north and boundary verification, and your council name or DA reference. IFC and Revit files are also accepted.
Your first working draft is delivered within 48 hours of confirmed project start. One revision round is included. Final print-ready PDF typically delivered 3–5 business days from confirmed start. Priority delivery available for urgent DAs.
No. CasStudio is based in Skopje, North Macedonia (KAS STUDIO DOOEL). Invoices are issued in AUD from a non-Australian entity and are not subject to Australian GST. No deposit: the invoice is issued after final delivery and is payable within 14 days.
Get a Quote

Fixed-price quote within 24 hours.

  • From AUD 400 · council DA packs AUD 1,200
  • Complex / multi-unit scoped per project
  • 48-hour first draft
  • 1 included revision
  • No GST · Invoiced after final delivery · NET 14
Prepared to the applicable requirements as standard EST. 2008 · ARCHITECTURAL MODELLING · SHADOW & DAYLIGHT SPECIALISTS

Prefer to email directly? info@casstudio.com