Shadow Diagrams for
Brisbane DA Submissions.
Planning-focused shadow diagrams and overshadowing studies for Brisbane development applications. Send your project address, drawings and any planning request — we confirm the required shadow scope before quoting.
We read your council's planning scheme before we model a single shadow
Complete shadow documentation for your Brisbane development application
One fixed price. No hidden extras. No surprise charges for additional time-points or revision rounds.
Shadow Footprints at All Required Times
Existing and proposed shadows distinguished by colour at every council-required time-point — at the reference date and times set by the applicable planning scheme, with additional times where your scheme requires them.
Project-Specific Overshadowing Review
Where the project brief identifies an overshadowing or solar access assessment criterion, the study is prepared and summarised against that confirmed requirement.
Full Methodology Statement
Written methodology confirming software and sun-path model, site coordinates, applicable planning scheme provision and reference standard, analysis dates and times, and true north basis. Ready to include in your DA documentation as-is.
True North & Survey-Accurate Geometry
True north confirmed against your registered survey plan. Site boundaries, neighbouring property footprints and street alignment verified before work starts. Scale bar and north point annotation consistent with your architectural drawings.
Print-Ready PDF + DWG / ArchiCAD Source
A4/A3 print-ready PDF formatted for DA lodgement, plus full DWG and ArchiCAD source files. No locked files, no watermarks. Your architect can incorporate the drawings directly into the DA documentation set.
1 Included Revision
One revision round is included within the agreed project scope. We review the request, update the analysis and re-issue the set within 48 hours.
Applicable Planning Scheme Review
We review the property-specific City Plan information, including relevant zones, overlays, neighbourhood plans and development codes, together with any planning request or assessment benchmark supplied for the project.
Brisbane shadow diagram requirements are set by the Brisbane City Plan 2014 in combination with the Queensland State Planning Policy (SPP). Unlike NSW (which uses the ADG) or VIC (which uses ResCode), Brisbane's controls are zone-specific and must be confirmed against the applicable neighbourhood plan and the development code for the relevant zone.
Key parameters we confirm before starting every Brisbane project include: the applicable reference date (Brisbane does not have a single universal reference date — it varies by zone and development type), the required time-points, and the specific overshadowing threshold for the applicable zone. For multi-storey residential in higher-density zones, the City Plan Low Medium Density Residential Zone Code or the High Density Residential Zone Code applies.
We read your council's planning scheme and confirm all parameters in writing before modelling begins.
Brisbane City Plan 2014 / SPPBrisbane councils we regularly work with
We deliver shadow diagrams for Brisbane City Council and councils across South East Queensland. Each council and zone has specific planning scheme requirements — we confirm them before starting.
From brief to council-ready shadow diagram in four steps
Send Your Brief
Share your DA drawings, survey, and council name or DA reference number. We confirm the applicable planning scheme provision, reference dates and any specific requirements before starting.
Planning Scheme Research & Scope
We read your council's planning scheme and confirm the applicable Brisbane City Plan / SPP requirements, reference dates and analysis parameters in writing before work starts. No surprises mid-project.
First Draft in 48 Hours
Survey-accurate 3D model built. Shadow footprints generated at all required times. Methodology statement prepared. First working draft delivered within 48 hours of confirmed project start.
Final Deliverables
After your review and one revision round, final print-ready PDF, DWG and ArchiCAD source files delivered. Ready to lodge with your Brisbane council DA.
Transparent pricing. No surprises.
Every quote is fixed price — not hourly. Invoiced in AUD, no GST applicable.
Standard residential DA — single site, up to 3 required time-points, one planning scheme reference.
- Shadow footprints at all council-required assessment times
- Existing vs proposed shadows
- Overshadowing requirement verification
- True north calibration + scale bar
- Methodology statement included
- Print-ready PDF + DWG/ArchiCAD source
- 1 included revision · NET 14
Townhouses, multi-dwelling, or council-specific extra requirements.
- Everything in Single Lot DA, plus:
- Hourly intervals where required by council
- Elevation shadow diagrams on neighbouring walls
- Additional reference dates where required
- 3D perspective shadow views
Multi-storey, mixed-use, complex topography, or 5+ required time-points.
- Everything in Single Lot DA
- Multiple building envelopes compared
- Extended time-point coverage
- Topography and survey integration
- Priority 48-hour turnaround available
- Quoted per project scope
All prices in AUD, excluding GST. Invoiced from KAS STUDIO DOOEL, Skopje, North Macedonia. Fixed quotes issued within 24 hours of brief received.
Brisbane shadow diagram questions
Shadow diagrams across Australia
Fixed-price quote within 24 hours.
- From AUD 400 · council DA packs AUD 1,200
- Complex / multi-unit scoped per project
- 48-hour first draft
- 1 included revision
- No GST · NET 14 payment terms
Prefer to email directly? info@casstudio.com