Shadow Diagrams for
Australian DA Submissions.
Project-specific shadow diagrams for Australian development and planning applications. We review the state, local authority, development type and available planning requirements before confirming the shadow scope.
We review the applicable planning requirements before we model a single shadow
Why the Required Shadow Scope Varies Across Australia.
Shadow study requirements are not identical across Australian states or local authorities. The applicable development type, planning framework, project location and requested assessment information can affect the required dates, time intervals and drawing outputs.
For this reason, CasStudio confirms the available planning requirement and project scope before modelling begins.
Common Rejection Reasons
-
✕
Wrong reference date or time-step interval
Reference dates and time-step intervals vary by state and local authority — for example, 21 June (winter solstice) or 22 September (equinox), depending on the applicable planning framework. Using an incorrect date can require the study to be revised before it can be assessed.
-
✕
No methodology statement or software declaration
A written methodology note — confirming the sun-path model, software used, site coordinates and applicable planning reference — helps council assessment officers verify the results. Without it, the results can be difficult to independently verify.
-
✕
Incorrect true north or unverifiable scale
Shadow diagrams built from an incorrect north point, or without a calibrated scale bar, cannot be independently verified. This can result in a request for correction or resubmission, which may extend the assessment timeline.
The CasStudio Standard
-
✓
Planning-researched reference dates, every project
We review the applicable planning requirements and any relevant state planning policy before work starts. Reference dates, time-step intervals, and required seasonal analyses are confirmed in writing before we model a single shadow.
-
✓
Full methodology statement included as standard
Every deliverable includes a written methodology note confirming software, sun-path engine, site coordinates (latitude/longitude), applicable planning reference, and reference standard. Ready to include in your DA submission as-is.
-
✓
Survey-accurate geometry and confirmed true north
We build from your survey, DWG, ArchiCAD or IFC files. True north is confirmed against site survey or registered plan data before the first shadow is cast. Scale bar, north point and title block are production-ready for council submission.
State-by-state shadow diagram requirements
A quick reference guide to the key parameters we verify for each Australian state. Always confirmed against the applicable planning requirements before work starts.
| State / Territory | Reference Date | Required Times | Overshadowing Threshold | Key Planning Reference |
|---|---|---|---|---|
| NSW | 21 June (Winter Solstice) | 9am, 12pm, 3pm AEST | 2 hrs to living areas + POS (ADG); local planning requirements may specify additional criteria | Housing SEPP / ADG / Local Planning Scheme |
| VIC | 22 September (Equinox) | 9am–3pm AEST, hourly or per planning requirement | Solar access to secluded private open space under current Victorian residential planning provisions | Current Victorian planning scheme provisions / Local schedule |
| QLD | Varies by council | Council-specific | Solar access to habitable rooms and private open space; varies by LGA | SPP / Local Planning Scheme |
| WA | 21 June (Winter Solstice) | 9am–3pm AWST, hourly | Solar access to adjoining properties; confirmed against current R-Codes and LPS before each project | R-Codes / Local Planning Scheme |
Reference standards current as of 2025. Always confirmed against the current planning requirements before work commences.
Everything your DA submission requires
One fixed price. No hidden extras. No surprise charges for additional time-points or revision rounds.
Shadow Footprints at All Required Times
Existing shadows and proposed shadows distinguished by colour at every council-required time-point — 9am, 12pm and 3pm as standard, with additional times included where the planning requirements call for them.
Overshadowing Results Summary
The study results summarised against the identified planning criterion — Housing SEPP / ADG 2-hour minimum for NSW, current Victorian residential planning provisions for VIC, or the specific local planning control — stated clearly in the methodology note so your planner can reference it directly in the DA assessment.
Full Methodology Statement
Written methodology note confirming: software and sun-path model; site coordinates; applicable planning reference and standard; analysis dates and times; and the basis for true north calibration. Ready to lodge as-is.
True North & Survey-Accurate Geometry
True north confirmed against your registered survey plan or lot data. Site boundaries, neighbouring property footprints and street alignment verified against your survey before work starts. Scale bar and north point annotation consistent with your architectural drawings.
Print-Ready PDF + DWG / ArchiCAD Source
A4/A3 print-ready PDF formatted for DA lodgement, plus full DWG and/or ArchiCAD source files so your architect or certifier can verify the model independently. No locked files, no watermarks.
1 Included Revision
One revision round is included within the agreed project scope. We review the request, update the analysis as required, and re-issue the set within 48 hours.
Anonymised extracts from recently delivered Australian DA submissions. All projects include existing and proposed shadows at all required time-points.
Four time-point overshadowing analysis with neighbouring properties and site boundaries clearly marked. Housing SEPP / ADG solar access results summarised against the 2-hour criterion.
Overshadowing impact on secluded private open space at 22 September equinox. Applicable Victorian overshadowing threshold confirmed against the current planning provisions.
Existing vs proposed shadows distinguished by colour at council-specified reference times. Shadow impact on adjoining habitable rooms quantified.
From brief to council-ready PDF in four steps
Send Your Brief
Share your site plans, survey, and the council or DA reference number. We confirm the applicable planning reference, reference dates, and any specific requirements before we start. No guesswork, no assumptions.
Planning Research & Modelling
We review the applicable planning requirements and any relevant state policy (Housing SEPP / ADG for NSW, ResCode for VIC, SPP for QLD or R-Codes for WA), confirm the analysis parameters in writing, and build a survey-accurate 3D model with confirmed true north.
First Draft in 48 Hours
Your first working draft arrives within 48 hours of confirmed project start. You review, request any changes, and we revise — one full revision round is included at no extra charge.
Print-Ready Deliverables
Once approved, you receive a print-ready PDF formatted for council lodgement, plus DWG and/or ArchiCAD source files. Methodology statement included. Ready to attach to your DA documentation.
Transparent pricing. No surprises.
Every quote is fixed price — not hourly. You know the total before work starts. Invoiced in AUD, no GST applicable (invoiced from North Macedonia under export rules).
Standard residential DA — single site, up to 3 required time-points, one planning reference.
- Shadow footprints at all council-required assessment times
- Existing vs proposed shadows distinguished
- True north calibration + scale bar
- Methodology statement included
- Print-ready PDF + DWG/ArchiCAD source
- 1 included revision
- NET 14 payment terms
Townhouses, multi-dwelling, or state/council-specific extra requirements.
- Everything in Single Lot DA, plus:
- Hourly intervals where required
- Elevation shadow diagrams on neighbouring walls
- Additional reference dates where required
- 3D perspective shadow views
Multi-storey residential, mixed-use, precinct studies, topographically complex sites, or 5+ required time-points.
- Everything in Single Lot DA
- Multiple building envelopes / massing options
- Extended time-point coverage
- ADG solar access analysis with results summary
- Topography and survey integration
- Priority 48-hour turnaround available
- Quoted per project scope
All prices in AUD, excluding GST. Invoiced from KAS STUDIO DOOEL, Skopje, North Macedonia. Fixed quotes issued within 24 hours of brief received.
Australian cities we regularly work in
We deliver shadow diagrams for council areas across NSW, VIC, QLD and WA. Not in the list? Get in touch — we work with any local planning authority.
Sydney is currently the only city with a dedicated page. Additional city pages coming soon.
Common questions about Australian shadow diagrams
Need shadow diagrams for the UK instead?
Fixed-price quote within 24 hours.
- From AUD 400 · council DA packs AUD 1,200
- 48-hour first draft
- 1 included revision
- No GST · NET 14 payment terms
Prefer to email directly? info@casstudio.com