Skip to main content
Services Shadow Diagrams Daylight & Sunlight 3D Visualisation Point Cloud to BIM Portfolio About Contact
Get a Quote
Australia

Worried a Neighbour's Development Will Overshadow Your Home?

Yes, we work for neighbours and adjoining owners. If a development application next door could take the sun from your backyard, your windows or your rooftop solar panels, we build an independent 3D model from the application drawings and show, hour by hour, how much additional shadow falls on your property. The results are reported as they are, whether or not they support a submission. Independent shadow diagrams from AUD 650, first draft within three working days.

Est. 2008 950+ projects Quote within 24 hours 1 Included Revision

Independent shadow diagrams, overshadowing study, shadow impact study: all names for the same service.

Independent, and neutral

  • Built from the lodged drawings. We model the proposal from the same application drawings the council is assessing, with your house and garden beside it. The report states what the model shows, including when the additional shadow is small.
  • No promised outcome. The council decides the application, and overshadowing is one of several matters it weighs. We do not tell you the application will be refused or changed.
  • Yours to use. Attach the drawings to your submission, give them to your town planner or solicitor, or use them to talk to your neighbour about changes to the design.
Hourly shadow plans for 21 June from 9am to 3pm AEST showing the shadow cast by a proposed dwelling on the neighbouring house, Brisbane City Council development application
Hourly shadow plans, 21 June9am to 3pm AEST: shadow from a proposed dwelling on the neighbouring house. Brisbane City Council development application, 2026.
Isometric 3D views of the shadow cast by a proposed dwelling at 1pm, 2pm and 3pm on 21 June, Brisbane development application
3D shadow views, 21 JuneViews at 1pm, 2pm and 3pm, showing the shadow cast by the proposed dwelling only.

Is overshadowing a valid ground for a submission?

Yes. Overshadowing of a neighbour's home and private open space is a planning matter in every Australian state, and each state or council has a control for it. State guidance in Victoria and Queensland makes the same point in different words: a submission should be factual, specific to the proposal and tied to the planning controls (Planning Victoria; Queensland Government factsheet). In Queensland, a concern that the development will lower your property's value cannot be taken into account.

What is tested depends on where you live:

StateThe controlDate and times
NSWHouses: your council's DCP sets the hours of sun that living rooms and private open space next door should keep. Apartments: the Apartment Design Guide.Commonly 21 June, between 9am and 3pm
VictoriaClauses 54 and 55 (Standards A4-3 and B4-3): more than 50% of your secluded private open space, or 25 m² with a 3 m minimum dimension, whichever is less, should stay out of shadow for at least five hours. Separate standards cover existing north-facing windows and existing rooftop solar energy systems (Planning Victoria).22 September, 9am to 3pm
QueenslandNo statewide test. In Brisbane, the City Plan 2014 codes ask that a new house does not unduly overshadow adjoining houses and their private open space. Dates and times are set for each application.Set by the council. For example 21 June, hourly from 9am to 3pm, on a 2026 Brisbane City Council DA
Western AustraliaR-Codes Volume 1: the shadow cast over an adjoining lot should not exceed 25% of its site area (R25 and lower), 35% (R30 to R40) or 50% (above R40) (R-Codes Volume 1).21 June, midday

We confirm the control and the dates for your council in writing before modelling.

Can you make a submission? Check the approval pathway first

Not every approval is open to submissions. This decides whether independent diagrams can be used formally, so check it before you order.

StateOpen to submissionsNot open, or limited
NSWDevelopment applications on exhibition. The exhibition period is commonly 14 days, and submissions are due before the closing date on your notification letter (City of Sydney).Complying development (CDC): neighbours are notified, but cannot make a submission (NSW Planning).
VictoriaPlanning permit applications on notice. The notice period is at least 14 days, and the council can consider objections until it makes its decision (Planning Victoria).Under the Townhouse and Low-Rise Code (clause 55), if all the applicable standards are met, objectors have no right of review at VCAT. The overshadowing, north-facing window and solar energy standards are among them (Planning Victoria).
QueenslandImpact assessable applications. Public notification runs for at least 15 business days (business days from 20 December to 5 January are not counted). A properly made submission gives you appeal rights in the Planning and Environment Court (Brisbane City Council).Code assessable applications are not publicly notified. You can still send comments to the council, which considers them, but comments carry no appeal rights (Brisbane City Council).
Western AustraliaProposals that rely on design principles and may affect your amenity: the council may invite your comment, and its letter gives the closing date.Proposals that meet the deemed-to-comply provisions are not advertised to neighbours (R-Codes Volume 1, Part A).

In Victoria this matters twice. Whether the overshadowing standard is met affects the council's decision, and it also affects whether you can ask VCAT to review that decision.

When independent shadow diagrams are worth it

  • Worth it: the application is open to submissions or comments; the proposal sits to the north, east or west of your yard, living-room windows or solar panels; it is two storeys or more, or close to the boundary; and the applicant's diagrams show only three times of day, leave out your windows, or do not match what you see on site.
  • Probably not: the proposal is to the south of your property (in Australia the winter sun is in the northern sky, so its shadow falls away from you); the approval pathway has no submissions; or the closing date is less than three working days away.
  • Not sure? Send us the application number and your address. We will tell you whether diagrams are likely to help before we quote, at no cost.

Timing

  • First draft within three working days of receiving the application drawings. Tell us the closing date when you enquire.
  • NSW: the closing date is on your notification letter.
  • Victoria: lodge within the notice period where you can. The council can still consider an objection received before it decides.
  • Queensland: the closing date for an impact assessable application is shown on the council's register (Development.i in Brisbane).
  • One round of revisions is included.

From AUD 650: what is included

  • A 3D model of the proposed development, built from the application drawings, together with your house and garden.
  • Shadow diagrams at hourly intervals from 9am to 3pm, existing and proposed side by side, with the additional shadow marked.
  • Elevation views showing where the shadow falls on your walls and windows that face the development.
  • The area of your private open space in additional shadow at each hour, in square metres and as a percentage.
  • In Western Australia: the share of your lot in shadow at midday on 21 June, which is the R-Codes test.
  • Where the control is a number (Victoria's five-hour test, the R-Codes percentage, a DCP's hours of sun), the measured result set beside that number.
  • A written methodology statement: the drawings used, the sun position data, and the dates and times assessed.
  • Print-ready PDF drawings. Other formats are available on request.
  • One round of revisions.
  • First draft within three working days of receiving the application drawings.

What we need from you

  • The application drawings (site plan, elevations, roof plan), usually available from your council's online register. The application number is enough if the plans are online.
  • Your address and a few photographs of the side of your house and garden that faces the development.
  • A survey of your property, if you have one.

What is not included

  • Legal advice, a planning opinion on whether the application should be approved or refused, writing or lodging your submission, representation, and expert witness evidence.
  • A site visit.

When the price is higher

  • More than one proposed building, multi-storey schemes, or steep sites. These are quoted per project before any work starts.
  • If the applicant lodges amended plans after delivery, an updated study is quoted separately.

You pay after delivery, in AUD. Homeowners pay online by card through a secure payment request. Business clients can pay by Australian bank transfer instead. No GST applicable. Invoices are issued by KAS STUDIO DOOEL.

FAQ

Questions before you order

Both. For a neighbour we model the proposal from the lodged application drawings and report the shadow it adds to your property. The method is the same whoever the client is, and so are the results.
From AUD 650 for one proposed building next to one property: hourly plans from 9am to 3pm, elevation views of your walls and windows, measured areas, a methodology statement and one round of revisions. More than one proposed building, multi-storey schemes and steep sites are quoted per project. Invoiced in AUD, no GST applicable.
The applicant's diagrams answer the applicant's brief. They often show three times of day in plan only, which cannot show the hours of sun a window or yard keeps. An independent set checks true north, ground levels and the height of the proposal against the drawings, adds the hours in between and the elevation views, and measures the area affected. If our model agrees with theirs, we say so.
The application number or the drawings (site plan, elevations, roof plan), your address, and a few photographs of the side of your house and garden that faces the development. A survey of your property helps if you have one.
No. We work from the application drawings, aerial and survey information, and your photographs.
First draft within three working days of receiving the application drawings. One round of revisions is included. Tell us your closing date when you enquire, and we will say straight away whether it can be met.
The ones your council's control uses. Commonly 21 June between 9am and 3pm in NSW, 22 September between 9am and 3pm in Victoria, and midday on 21 June in Western Australia. Queensland has no statewide date, so the council sets it for each application; a 2026 Brisbane City Council DA used 21 June, hourly from 9am to 3pm. We confirm the dates in writing before modelling.
We cannot promise that. The diagrams give the council measured evidence of the effect on your property. The council decides, and it weighs overshadowing with other matters.
In NSW, neighbours cannot make a submission on a complying development. In Queensland, code assessable applications are not publicly notified; you can send comments to the council, but they carry no appeal rights. If you are not sure which pathway applies, send us the application number and we will check before quoting.
No. We supply the drawings, the measured results and the methodology statement. Writing the submission, planning advice, legal advice and expert witness evidence are outside our service; a town planner or solicitor can use our drawings for that.
Yes. The panels are modelled on your roof and the diagrams show when the proposal shades them. See solar panels next door for the rules in each state.
CasStudio has prepared shadow and daylight studies since 2008, including a 2026 Brisbane City Council development application where Council accepted the drawings. Before modelling we read the control your council applies and confirm the scope in writing.
One round of revisions is included. If the applicant lodges amended plans after delivery, an updated study is quoted separately.
After delivery, with no deposit. You receive an invoice in AUD with a secure online payment request and pay by card. Business clients can pay by Australian bank transfer instead. Payment is due within 14 days, and no GST is applicable. Invoices are issued by KAS STUDIO DOOEL.
Request a Quote

Send us the application number. We respond within 24 hours.

  • Written quote in AUD before any work starts
  • We check the approval pathway and the scope before you commit
  • No obligation. No sales calls.

Email: info@casstudio.com
Working hours: Mon–Fri, 08:00–18:00